Projects Completed

CUNNING - Icon    Various High Voltage Audits

CUNNING - Icon    Various Protection / Fault Studies

CUNNING - Icon    Project Engineer (November 2017 – Present) – BHP
Rail Optimization Project (Cunning Engineering) including the following projects:

– Saraji / Goonyella / Riverside / Peak Downs Weighbridge Upgrades
– Peak Downs / Caval Ridge and Saraji TLO Automation Upgrades

Note: Peak Downs TLO Automation Upgrade – AEEA 2020 Finalist

CUNNING - Icon    Design Engineer (June 2018 – Present) – Hammelmann Dust Suppression Skids Project – Various Mine sites (Cunning Engineering) including the following projects:

– Riverside Mine DSS – ROM
– South Flank Mine DSS – ROM x 2
– South Flank Mine DSS – COS x 2
– Coppabella Mine DSS – ROM
– Daunia Mine DSS – ROM
– Al Taweelah DSS – Ship Unloader
– Goonyella Mine DSS – ROMs / COS x 5
– Koodaideri Mine DSS – ROM x 2
– Olympic Dam DSU
– South 32 DSU
– Jimblebar Mine DSU – ROM x 3

CUNNING - Icon    Project Engineer (September 2020) – Byerwyn Mine Earth Grid Design (Cunning Engineering)

CUNNING - Icon    Project Engineer (September 2020) – South Walker Creek Tailings Dewatering Concept Study (Cunning Engineering)

CUNNING - Icon    Project Engineer (August 2020) – South Walker Creek Fire Pump Upgrade (M2E Services)

CUNNING - Icon    Project Engineer (May 2020) – Queensland Sugar MCC1 Arc Flash Study (Cunning Engineering)

CUNNING - Icon    Project Engineer (October 2019 – December 2019) –Queensland Sugar Mackay Substation 4 MCC Upgrade (Cunning Engineering)

CUNNING - Icon    Project Engineer (June 2019 – August 2019) – Hay Point Services Shiploader No.1 Boom Upgrade (Cunning Engineering)

CUNNING - Icon    Project Engineer (May 2019) – Hay Point Services Server Room Distribution Board Upgrade (M2E Services)

CUNNING - Icon    Project Engineer (June 2018 – March 2019) – SWC Washplant No.2 RMU Upgrade (M2E Services)

CUNNING - Icon    Project Engineer (September 2017 – October 2017) – Peak Downs Mine ROM Automation Improvement Project (M2E Services)

CUNNING - Icon    Project Engineer (June 2017 – August 2017) – SWC Braeside Pump Station Upgrade (M2E Services)

CUNNING - Icon    Project Engineer (May 2017) – Saraji Mine One Mile Dam Pump Station Upgrade (M2E Services)

CUNNING - Icon    Project / Commissioning Engineer (February 2017 – April 2017) – Glencore Collinsville Mine ROM MCC Upgrade (M2E Services)

CUNNING - Icon    Project Engineer (November 2016 – January 2017) – Blackwater Mine DRE41 Shutdown (M2E Services)

CUNNING - Icon    Design Engineer (August 2016 – September 2016) – Saraji Mine One Mile Dam Pump Station Upgrade (M2E Services)

CUNNING - Icon    Project Engineer / Project Manager (March 2016 – August 2016) – Hay Point SL1 PLC Upgrade (M2E Services)

CUNNING - Icon    Project Engineer / Project Manager (December 2014 – January 2016) – South Walker Creek MCC Relocation Works (M2E Services)

CUNNING - Icon    Project / Commissioning Engineer (October 2015 – November 2015) – Glencore Collinsville Mine CHPP MCC Upgrade (M2E Services)

CUNNING - Icon    Project / Commissioning Engineer (July 2015) – DBCT L5 / S1 Telemetry Upgrade (M2E Services)

CUNNING - Icon    Project / Commissioning Engineer (June 2015) – BMA Pump Station Upgrades – Bedford East / Bedford West No.1 / Bedford West No.2 / Selma (M2E Services)

CUNNING - Icon    Project Engineer (March 2015 – April 2015) – Dalrymple Bay Coal Terminal Substation SS3B Electrical Upgrade (M2E Services)

CUNNING - Icon    Design Engineer (January 2015 – February 2015) – DBCT 2ML Tank Design (Waterline Projects)

CUNNING - Icon    Project Engineer (August 2014 – December 2014) – Dalrymple Bay Coal Terminal Substation SS3B Electrical Upgrade (M2E Services)

CUNNING - Icon    Engineering / Drafting Services – DCS Saraji Mine Shutdown (July 2014)

CUNNING - Icon    Engineering / Drafting Services – Wesfarmers Curragh Dragline (June 2014)

CUNNING - Icon    Project / Commissioning Engineer (February 2014 – May 2014) – Wesfarmers Curragh Dragline 301 Rewire (M2E Services)

CUNNING - Icon    Design Engineer November 2013 – July 2014) – DBCT SS3B Pumping Station Upgrade (Waterline Projects)

CUNNING - Icon    Design Engineer / Project Manager (September 2013 – Present) – South Walker Creek Minor Electrical Upgrade Works (M2E Services)

CUNNING - Icon    Project / Commissioning Engineer (August 2013) – Peak Downs Train Loadout PLC Upgrade (M2E Services)

CUNNING - Icon    Design Engineer / Project Manager (February 2013 – June 2013) – South Walker Creek ROM Lighting Upgrade (M2E Services)

CUNNING - Icon    Design Engineer / Project Manager (July 2013) – Sunmetals HV Asset Protection Upgrade (Waterline Projects)